Manufacture and first wall joining for an ITER primary wall module prototype: R&D phase with small scale mock-ups

I Bobin-Vastra, M Febvre, P Lorenzetto, Y Bouveret, D Conchon2001年Fusion Engineering and DesignIF 1.7出版社

AbstractIn the frame of the Primary Wall Module prototype manufacturing for ITER, a consistent R&D phase was conducted in order to identify the industrial allowable tolerances and manufacturing problems which would occur when joining pieces by HIPping process during the PW module manufacturing. The purpose of this development was to give as industrial as possible manufacturing routes for joining together large Stainless Steel or DS-Copper pieces with Stainless Steel tubes and for bonding Beryllium tiles onto a curved component surface. The study concerned surface preparations, allowable gaps and joint geometry, Beryllium tile geometry, Titanium interlayer thickness, … This R&D phase also allowed the development and validation of different ultrasonic inspection tools needed for plate-plate, tube-plate, edge to edge plate bonding.

日本語訳

ITER用原型第一壁モジュールの製造において、工業的に許容可能な公差と、PWモジュール製造中のHIP接合プロセスで部品を接合する際に発生するであろう製造上の問題を特定するために、一貫した研究開発フェーズが実施された。この開発の目的は、大型ステンレス鋼またはDS銅部品をステンレス鋼管と接合し、ベリリウムタイルを湾曲した部品表面に接合するための、可能な限り工業的な製造ルートを確立することであった。本研究は、表面処理、許容ギャップ、接合形状、ベリリウムタイル形状、チタン中間層の厚さなどを対象とした。この研究開発フェーズではまた、平板-平板、管-平板、平板端部-平板端部の接合に必要な様々な超音波検査ツールの開発も行われた。

装置

iter高精度(タイトル一致)

wiki

ITERFirst wall
この論文にはまだAI要約がありません。

関連論文

Fabrication of a first wall panel by diffusion bonding

2002Fusion Engineering and Design

Manufacture and first wall joining for an ITER primary wall module prototype: results of a medium scale mock-up manufacturing

2001Fusion Engineering and Design

Engineering design of the ITER blanket and relevant research and development results

1999Fusion Engineering and Design

Overview of advanced techniques for fabrication and testing of ITER multilayer plasma facing walls

1998Fusion Engineering and Design

Failure analysis of beryllium tile assemblies following high heat flux testing for the ITER program

2000Fusion Engineering and Design

ITER first wall/shield blanket

1998Fusion Engineering and Design

Technologies for the realization of large size RF sources for negative neutral beam systems for ITER. Challenges, experience and the path ahead

2019Nuclear Fusion

Manufacture of an ITER primary wall module shield prototype by powder hipping

2001Fusion Engineering and Design

Thermal fatigue testing of an ITER primary wall small scale mock up

1998Fusion Engineering and Design

Evaluation of mock-ups before manufacture of a shield block prototype by powder HIP

2000Fusion Engineering and Design