AbstractThe waste management activities at JET include not only the collection, processing and dispatch of radioactive and beryllium contaminated waste, but also for the operation of several supporting facilities (the beryllium-controlled areas); the provision of respiratory protection; (including pressurised suit operations) and the procedural support for maintenance of active handling operations. The consequences of carrying out the Deuterium-Tritium experiment (DTE1) were reviewed throughout 1996 and 1997 in order that appropriate preparations could be implemented. Several procedural, regulatory, technical, and managerial functions were identified for modification and the planning and subsequent execution of these functions is described here. In general the regulatory and procedural aspects were accurately anticipated, e.g. radioactive waste authorisations, the operation of the radioactive drainage system and improvements in managerial control were successfully implemented. However, in the case of materials storage the increased tritium off-gassing rates were higher than expected. This required the engineering controls and storage facilities to be enhanced before the DTE1 tile modules could be transferred from the Torus Hall. The predicted consequences of DTE1 and the preparations made are detailed here with discussion of further actions which proved necessary in practice.
JETにおける廃棄物管理活動には、放射性およびベリリウム汚染廃棄物の収集、処理、搬出だけでなく、いくつかの支援施設(ベリリウム管理区域)の運転、呼吸用保護具の提供(与圧スーツ作業を含む)、および活性化ハンドリング作業の保守手順の支援も含まれる。重水素-トリチウム実験(DTE1)を実施した結果の影響は、適切な準備が実施できるよう1996年から1997年にかけて見直された。修正が必要な手順、規制、技術、および管理上の機能がいくつか特定され、これらの機能の計画およびその後の実施についてここに記載する。概して、規制上および手順上の側面は正確に予測されており、例えば、放射性廃棄物の認可、放射性排水システムの運転、および管理上の改善は首尾よく実施された。しかしながら、材料貯蔵の場合は、トリチウムの放出率の上昇が予想以上であった。このため、DTE1タイリングモジュールをトーラスホールから移送する前に、工学的対策および貯蔵設備を強化する必要があった。DTE1の予測された結果と講じた準備措置について、実際に必要となった追加措置の考察とともに、ここに詳述する。