FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions

F. Schmalz, F.J. Blom, S. Kamer, D.J. Ketema2007年Fusion Engineering and DesignIF 1.7出版社

装置

iter高精度(タイトル一致)

wiki

ITERFirst wall
この論文にはまだAI要約がありません。

関連論文

In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor

2015Fusion Engineering and Design

Progress on fatigue characterization of ITER primary first wall mock-ups

2003Fusion Engineering and Design

Thermal fatigue cycling of Be/Cu joining mock-ups

2009Fusion Engineering and Design

Main achievements of the EU HT test programme of ITER primary wall small scale mock ups

2000Fusion Engineering and Design

Thermal–mechanical test on ITER primary first wall mock-ups

2002Fusion Engineering and Design

Thermal fatigue tests on disruption-damaged first-wall components

1997Fusion Engineering and Design

Study on thermal fatigue testing of a prototypical first wall component

1996Fusion Engineering and Design

Considerations in testing of ITER first wall mockups

2007Fusion Engineering and Design

FEM and thermal fatigue testing comparison of ITER-like divertor PFUs mock-ups for DEMO

2018Fusion Engineering and Design

Thermal fatigue of DEMO first wall due to pulsed operation

2011Fusion Engineering and Design